Corrections Log: Every Error We Fixed, With the Date
People sit the exam on these pages. A mistake logged in public does less damage than one quietly edited away.
How a fix works
We fix the error, date the fix, and record it in the table below with what the page said before.
A site that edits its mistakes in silence gives you no way to judge how often it makes them.
Why it matters to you
You read a page, sit the exam, and pass or fail. A retake costs $78 and another booking.
So when this site doesn't know something, the page says so plainly.
The log
Each entry gives the date, the page, what was wrong and what the page says now.
| Date | Page | What was wrong | What it says now |
|---|---|---|---|
| 2026-08-23 | Box fill | Said all equipment grounding conductors in a box share one volume allowance, however many there are. That was the old rule, and it was also the worked answer in a practice question. | Up to four share one allowance and each one after the fourth adds a quarter, per 314.16(B)(5). Six is one and a half. The practice question was rewritten to test the threshold. |
| 2026-08-23 | Grounding vs bonding | Attributed the earth is not an effective fault current path to 250.4(A)(4), and the low impedance path wording to 250.4(A)(3). | Both sit under 250.4(A)(5). The earth sentence is 250.4(A)(5)(c). |
| 2026-08-23 | Services | Said 230.71 requires service disconnects to be grouped. | 230.71 sets the count. 230.72 requires grouping and marking. |
| 2026-08-23 | Code navigation | Sent readers to 312.6 for wire-bending space, to 120.80 for the optional dwelling method, and to 230.71 for grouping. | 312.9, 120.82 and 230.72. There is no 312.6 in the 2026 edition at all. |
| 2026-08-23 | GFCI and AFCI | Said 210.12 is organized around branch circuits. | It turns on location. Each subsection is a list of rooms and areas. |
| 2026-08-23 | Overcurrent, small conductors | Said the 2026 edition added the remote adjustable-trip breaker rules at 240.6(D). | The 2026 text marks that section as revised, not as new, so it predates this cycle. |
| 2026-08-23 | Transformer calculations | Cited 450.3 for transformer overcurrent protection, and stated 240.4(F) without its two permitted configurations. | 450.5. In 2026, 450.3 is Reconditioned Equipment and both subsections are reserved. The 240.4(F) note now names the exceptions. |
| 2026-08-23 | Wiring methods, feeders, voltage drop | Cited 300.4 for protection against physical damage and 215.2 for minimum feeder rating. | 300.6 and 215.4. Both moved in the 2026 edition. |
| 2026-08-23 | 2026 code changes: Grounding changes | Said equipment grounding conductors are in Part IV of Article 250, starting at 250.110. Also attributed two performance sentences to 250.4(A)(3) and 250.4(A)(4), and stated the 250.97 bonding requirement without its exception. | Part VI, starting at 250.109. Both performance sentences are under 250.4(A)(5). The 250.97 exception, which permits ordinary locknuts and shouldered fittings where no oversized or concentric knockouts are encountered, is now on the page. |
| 2026-08-23 | 2026 code changes: Remote breakers, 240.6(D) | Said the 2026 edition added the section. | The 2026 text carries the revision marker on it and no new-material marker, so it predates this cycle. |
| 2026-08-23 | 2026 code changes: Renumbering | Listed the Article 220 to Article 120 move and stopped there. | Five further moves are listed, each checked in the book: 312.6 to 312.9, 300.4 to 300.6, 450.3 to 450.5, 215.2 to 215.4, and 250.24(A)(5) to 250.24(B). Two of those old numbers are now occupied by different rules. |
| 2026-08-24 | Code navigation, and a correction to a correction | The entry above, dated 2026-08-23, says there is no 312.6 in the 2026 edition at all. That is wrong, and it is wrong in the dangerous direction. | Article 312 renumbered as a block, so 312.6 exists and carries a different rule. A stale tab now lands on real text, which is harder to notice than a blank. The destination for wire-bending space, 312.9, was right. We have not read what now sits at 312.6, so we do not say. |
| 2026-08-24 | Practice bank, answer position | Every question in the bank was written with the correct option first and the practice exam printed options in that order, so answering A to everything scored one hundred percent. | The paper now shuffles each question's options when it is drawn, carrying the answer key and the per-option explanations with it. Three checks now confirm the shuffle every time the bank changes. |
| 2026-08-24 | Practice bank, exam simulation mix | The simulation drew sixty percent of its questions from the calculation areas. | The published blueprint is twenty-four calculation items out of eighty scored, which is thirty percent. The simulation now matches it and is clocked at the real per-portion pace. Practice mode still leans toward calculations on purpose, because those portions carry the lower pass rates. |
| 2026-08-24 | Practice bank, a motor conductor question | One question offered 152.75 amperes as its correct answer while its own worked explanation reached 151.75 twice. No option on the screen was right. | The option is 151.75. A check now stops any update where a numeric answer is missing from its own working. |
| 2026-08-23 | Load calculations, branch circuits | Cited 120.14 for dwelling small-appliance and laundry loads, 120.80 for the optional method, and stated the 3 VA per square foot branch circuit figure without scoping it. | 120.52 and 120.82. The 3 VA figure is scoped to dwelling units; non-dwellings use Table 120.42(A). |
| 2026-08-24 | Grounding vs bonding, and which of our own files was wrong | The 2026-08-23 entry above moved the earth sentence to 250.4(A)(5)(c). The internal Article 250 file, read off the 2026 pages the day before, still recorded it at 250.4(A)(4) and worded it as effective fault-current path. Two reviews flagged the disagreement and it sat unresolved. | The page was right and the file was wrong. 250.4(A) is Grounded Systems, 250.4(B) is Ungrounded Systems, and the two halves run in parallel with nearly the same words. The file had captured the (B) half and written down the letter A. On a grounded system the sentence is 250.4(A)(5)(c), titled Use of the Earth, and it reads effective ground-fault current path. Its ungrounded twin at 250.4(B)(4) reads effective fault-current path, one word apart, and that is the one the file actually holds. The file is re-keyed to (B)(3) and (B)(4) and now records the mix-up in plain view. No published page text changed. |
| 2026-08-24 | 2026 code changes: Renumbering, and a correction to a correction | The 2026-08-23 entry above says five further moves were each checked in the book, and lists 312.6 to 312.9 and 215.2 to 215.4 among them. | Two of those five were not checked as thoroughly as that sentence claims. 312.6 is occupied, and we had it down as empty. And we could not confirm 215.2 to 215.4 in the book at all, so the page now marks it as unread and no longer states it as fact. The other three moves stand. |
| 2026-08-24 | 2026 code changes: Book checker, article provenance | Said Article 206 was lifted out of Section 300.26, and listed terminal block fill as a 2026 change. | Article 206 was assembled from the Class 1 non-power-limited content of Articles 724 and 725. Terminal block fill arrived in the 2023 edition, so it does not belong on a page about what changed since 2023. |
| 2026-08-24 | 2026 code changes: Drill, Article 404 | Taught that Article 404 is switches and 406 is receptacles, which is the distinction the 2026 edition abolished. | Device-type switches, including snap switches and dimmers, moved to Article 406, which was retitled Wiring Devices. Article 404 keeps general-use, motor-circuit, isolating and pullout switches and molded-case switches. The drill was given an item for each side. |
| 2026-08-24 | 2026 code changes: Renumbering, and eleven pages besides | Said Chapter 2 became Chapter 1 and everything downstream shifted. Twelve pages carried a version of that sentence. | No chapter was renumbered in the 2026 edition. Articles moved between chapters, and Chapter 1 went from two articles to four. Caught by reading the 2026 table of contents against the 2023 one. |
| 2026-08-24 | 2026 code changes: New articles | Listed eleven article numbers as new in 2026: 245, 305, 369, 371, 393, 425, 495, 512, 646, 724 and 726. | All eleven were already in the 2023 edition, which is what a new-article list looks like when it is built against a book two cycles old. Each number was checked against the 2023 structure. |
| 2026-08-24 | 2026 code changes: Reused numbers | Listed three article numbers that kept their number and changed subject. | There are four. Article 720 is now General Requirements for Limited-Energy System Wiring Methods and Materials, having been Circuits and Equipment Operating at Less Than 50 Volts. Found while checking the limited-energy set article by article. |
| 2026-11-10 | Equipment grounding conductor questions | Question 15 keyed 18 AWG copper as the smallest grounding conductor in a flexible cord whose largest circuit conductor is 10 AWG. | 10 AWG copper. 250.122(G) sets 18 AWG as the smallest size and also bars a grounding conductor smaller than the circuit conductors. Read in the 2026 book. |
| 2026-11-10 | Enclosure types questions | Question 23 keyed installation in a fenced area for outdoor equipment under the working space rules, while its own explanation pointed to identified enclosures. | Keyed to installation in identified enclosures, per 110.26(E)(2)(a)(1) in the 2026 book. |
| 2026-11-10 | GFCI and AFCI questions | Question 7 taught the 210.8(F) list of locations as a 2026 change, though the 2023 text already had it, and question 24 offered two options that were both changes 2026 did not make. | Question 7 asks what 2026 added besides the 60 ampere ceiling and keys the new Exception No. 3 for Class C special purpose GFCI protection on listed HVAC equipment. Question 24 swaps two options for real 2026 changes and keys C. |
| 2026-11-10 | Parallel conductors questions | Question 6 used the word set for one phase while the rest of the page used it for one raceway group, so the stem read two ways. Question 22 repeated a neutral-ground bond question word for word. | Question 6 says the A-phase conductors are all 500 kcmil and the B-phase conductors all 400 kcmil, keyed that one phase need not match another under 310.10(G). Question 22 is a new item on sectioned equipment grounding conductors under 310.10(G)(5). |
| 2026-11-10 | Demand factors, dwelling load calculation | Gave the dwelling optional method as the first 10 kVA at 100 percent and 40 percent of the remainder, so a 38,000 volt-ampere general load came to 21,200. | The first 8 kVA at 100 percent and 40 percent of the remainder under 120.82(B), so the same load comes to 20,000. Read in the 2026 book. |
| 2026-11-10 | Demand factors | Put the 125 percent for continuous loads on a feeder conductor at 215.2. | 215.4, where the 2026 edition puts feeder minimum rating and size. |
| 2026-11-10 | Rounding to the next standard size, overcurrent device types | Cited 430.52(C)(3) for the further increase allowed when a motor won't start. | 430.52(C)(1)(b) for fuses and inverse time breakers and 430.52(C)(3)(b) for an instantaneous trip breaker, with 430.52(C)(1)(a) for the first step up to the next standard rating. |
| 2026-11-10 | Parallel conductors | Cited 300.3(B) for keeping the conductors of a circuit in one raceway or cable. | 300.5(B), Conductors of the Same Circuit, in the 2026 edition. |
| 2026-11-10 | Code navigation, the correction to a correction | The 2026-08-24 entry above said Article 312 renumbered as a block, so 312.6 exists and carries a different rule. | That entry was wrong, and the 2026-08-23 entry was right. The printed 2026 book runs from 312.5 Position in Wall to 312.7 Repairing Noncombustible Surfaces with no 312.6 between them. Wire-bending space is at 312.9. |
| 2026-11-10 | 2026 code changes: Renumbering and the crosswalk | The 2026-08-24 entry above said 215.2 to 215.4 could not be confirmed in the book, and the crosswalk counted 21 of its 50 rows as read in the book and 5 as not settled. | Read in the printed 2026 book, page 70-106: Article 215 runs from 215.1 Scope to 215.4 Minimum Rating and Size, with no 215.2. That made 22 rows read in the book and 4 not settled. |
| 2026-11-12 | Demand factors, dwelling load calculation | Cited 120.60 for noncoincident loads such as heating against air conditioning. | 120.6, in the general part at the front of Article 120. The 2026 edition has no 120.60. |
| 2026-11-12 | Exam day and code use, exam topics | Said TDLR's approval opens the one-year window for finishing the license requirements. | The window runs one year from the day TDLR receives the application, under 16 TAC 73.20(b). |
| 2026-11-12 | Journeyman exam, master exam, failed the exam, test day | Said no published rule sets how long an examination result stays valid, and that a passed portion can't outlive its application. | 16 TAC 60.56 keeps examination results valid for four years from the exam date for a license on a one-year term. How PSI records a passed portion against a retake still isn't published, so the pages say to ask PSI. |
| 2026-11-12 | Home, exam day and code use, exam topics | Gave two ways to reach the journeyman exam, 7,000 hours or an approved accelerated program, and the exam pages gave 7,000 hours alone. | 16 TAC 73.21(b) also opens the exam on completing an apprenticeship training program, as Tex. Occ. Code 1305.002(1-b) defines it. |
| 2026-11-12 | Home | Called the 7,000 hour route new and said it could save a year of waiting. | TDLR's preamble to the June 2026 rule says department policy already let applicants sit at 7,000 hours, so the rule wrote down existing practice. |
| 2026-11-12 | Home, tools, terms | Said we keep no email address or anything else about buyers, and called the question bank the only thing for sale. | Stripe keeps the payment record with the email you paid with, a team seat is tracked by a one-way fingerprint of the email that claimed it, and the 2023 to 2026 NEC crosswalk is for sale as well. |
| 2026-11-12 | Home, about, tools, terms | Said every practice question was written for this site. | Trojan Digital Marketing writes the bank for its prep sites in several states. Seven of the 500, on Texas rules, appear only here, and the 1,350 topic questions are this site's own. |
| 2026-11-12 | 2026 code changes: Crosswalk and Did It Move | Counted 22 of the 50 rows as read in the 2026 book. Of the other 28, 24 came from NFPA panel drafts and 4 were not settled. | 37 are read in the printed 2026 book, with a page number on each row. Twelve still come from panel drafts and one is not settled. |
| 2026-11-12 | 2026 code changes: 312.6 in the crosswalk and the renumbering pages | The crosswalk row and the 2026-08-24 entry above said the old 312.6 address is occupied by a rule we had not read. | The printed 2026 book has no 312.6. 312.5 Position in Wall is followed by 312.7 Repairing Noncombustible Surfaces, and wire-bending space is at 312.9, as the 2026-08-23 entry said. |
| 2026-11-12 | 2026 code changes: Crosswalk row 90.3 | Said the 2026 sentence lets Chapters 5 through 8 supplement or modify Chapters 1 through 7, from a panel draft. | The printed 2026 book, page 70-25, reads Chapters 1 through 8. Chapter 8 now sits inside both groups, so Chapters 5 through 7 may modify it. |
| 2026-11-12 | 2026 code changes: Crosswalk row 250.4 | Looked the row up under 250.4(A)(3) and (A)(4) and left it as not settled. | Read in the printed 2026 book, pages 70-137 and 70-138. 250.4(A)(3) and (A)(4) kept their numbers and subjects, and 250.4(A)(5) became three lettered items, with the earth sentence at 250.4(A)(5)(c). |
| 2026-11-12 | 2026 code changes: Crosswalk row 240.3 | Called 240.3 Reconditioned Equipment an inference and left the row as not settled. | Read in the printed 2026 book, page 70-122: 240.3 is Reconditioned Equipment, and the 2023 section at that number, Other Articles with Table 240.3, came out this cycle. |
| 2026-11-12 | 2026 code changes: Crosswalk row 314.16 | Declined to give the 2026 number of the box fill volume table, since two readings disagreed. | Read in the printed 2026 book, pages 70-236 and 70-237: the caption is Table 314.16(B)(4). |
| 2026-11-12 | 2026 code changes: Crosswalk row 625.54 and future effective dates | Gave 625.54(B)(2), at electric vehicle outlets, as a clause that starts on January 1, 2029. | The clause with that date is 626.30(C), page 70-633, for receptacle outlets at electrified truck parking spaces. 625.54, page 70-630, carries no date. |
| 2026-11-12 | 2026 code changes: Future effective dates | Listed 551.40(D) as a clause that started on January 1, 2026, and put the marina listing clause at 555.35(D). | 551.40(D) carries no date in the printed book and is off the list. The marina clause is 555.35(E), and 315.2, which starts in 2032, was added. The page lists ten dates, three already running and seven ahead. |
| 2026-11-12 | 2026 code changes: Change markers and the pages that describe them | Said the 2026 book marks changes with four symbols and has no mark for a moved section. | The 2026 front matter lists six marks. The two added since 2023 are T, for text revised by a tentative interim amendment, and M, for a section moved from another location. |
| 2026-11-12 | 2026 code changes: Medium voltage split | Said the exception for overcurrent protection integral to a listed assembly is printed under 245.2(A) only. | The printed 2026 book, page 70-134, prints the same exception under 245.2(B) as well. |
| 2026-11-12 | 2026 code changes: Remote breakers, 240.6(D) | Said no 2026 revision touched 240.6(D) and that the panel made no first or second revision to it. | The printed 2026 book, page 70-124, carries 240.6(D) with a delta beside it, the mark for words deleted from a section. The rule itself arrived in the 2023 edition. |
| 2026-11-12 | 2026 code changes: Book check, now part of What to buy | The 2026-08-24 entry above said Article 206 was assembled from the Class 1 non-power-limited content of Articles 724 and 725. | Two accounts of where Article 206 came from are in circulation, and the printed book settles neither. It prints Article 206 as new material with its scope at 206.1, page 70-93, and the crosswalk row stays marked as not settled. |
| 2026-11-12 | 2026 code changes: the hub and the Texas pages | Spoke of the September 1, 2026 adoption as still to come. | Texas adopted the 2026 NEC effective September 1, 2026 under 16 TAC 73.100, and the pages say so in the past tense. |
| 2026-11-12 | 2026 code changes: Tentative interim amendments | Counted eight tentative interim amendments against the 2026 NEC. | NFPA has issued twelve, 26-1 to 26-12. Seven went into the printed book, and 26-8 to 26-12 came after it. |
| 2026-11-12 | 2026 code changes: HVAC GFCI timing | Called TIA 1924 pending, with comment open until September 9, 2026. | Its comment period closed on September 9, 2026, and NFPA had posted no amendment from it when we checked on 11 November 2026. |
We found every entry above ourselves, by checking pages that were already live against the 2026 code text and the primary sources. Reader reports go into the same log the same way, so send yours to support@trojandigitalmarketing.com.