Every Texas Exam Topic, Grouped by What the Paper Tests
90 study pages in 9 groups. Each group runs from the first thing to learn to the last, with one line on what each page settles.
How to use this list
Start with the group your score report or the weak-area check flags. Read its first page, work down the list, then run the matching question set on a clock. The footer on every page uses these same groups, so you can jump between them from anywhere on the site.
- Exam day and the code book, 18 pages
- Sizing and derating, 14 pages
- Fill and raceways, 13 pages
- Load calculations, 4 pages
- Motors and theory, 9 pages
- Grounding and bonding, 8 pages
- Circuits and devices, 11 pages
- Services and equipment, 7 pages
- Special occupancies, 9 pages
Exam day and the code book
- All eight exam areas: how the 500-question bank splits across the eight areas, and which area to open first.
- Journeyman exam format: 56 knowledge and 24 calculation items scored, 70 percent needed on each portion, 240 minutes in all.
- Master exam format: 70 and 30 scored items on longer clocks, with far more weight on motors and services.
- Test day, in order: arrival, ID, the book check and the calculator rules, taken from the September 2026 bulletin.
- First time sitting it: what the room is like, what gets a book refused, and what a bad day really costs you.
- Clock plan: countdown checkpoints for each portion, and what to do with an item that eats your time.
- Your code book in the room: the book you may bring, the tabs allowed in it, and how the clock shapes every lookup.
- Finding a rule fast: exam wording mapped to the article where each rule actually lives.
- Article 90: what the code covers, how its chapters work together, and who gets to interpret it.
- Listed, labeled, identified, approved: four defined words that items swap on purpose, and the one that is a decision.
- How wrong answers are built: each distractor is a mistake somebody expected you to make, so learn the common ones.
- 2023 or 2026 NEC: sit on or after September 1, 2026 and you are held to the 2026 book.
- Study plan: about 10 hours a week, with more than half of them going to calculations.
- After a failed sitting: read the score report first, since it names the portion you lost and roughly where.
- Veterans and the exam: military service counts toward hours and fees, and all three statutes stop at the exam itself.
- 2026 code changes: what moved from the 2023 book to the 2026 one, each change with the document it was read in.
- 2023 to 2026 crosswalk: fifty 2023 section numbers and where each one sits in the 2026 book, 14 rows free.
- Did it move?: a free ten question round on where 2023 section numbers landed in the 2026 edition.
Sizing and derating
- Conductor sizing overview: 68 of the 500 bank questions sit here, and this lists the ten topics in working order.
- Ampacity derating: two multipliers, then a termination limit that never gets multiplied.
- Termination temperature: which ampacity column the terminals let you read, whatever the insulation is rated for.
- Insulation types: the four decisions the insulation letters make inside derating, fill and burial items.
- Continuous loads: 3 hours at maximum current makes a load continuous, and this shows where the 125 percent lands.
- Small conductor limits: the 240.4(D) caps on 14, 12 and 10 AWG that still apply after the derating is done.
- Fuses and breakers: the device types and the marking terms an item expects you to read.
- Next standard size: when a calculated figure may round up to the next device rating, and when it has to stay below.
- Interrupting rating: three ratings that sound alike, what 110.24 puts on the equipment, and which one an item means.
- Parallel conductors: 1/0 AWG and up, with every conductor in a set matched so the current splits evenly.
- When the neutral counts: 310.15(E) decides from the type of circuit, so you count the neutral without measuring it.
- Tap rules: 10 foot, 25 foot and transformer taps, and what each one charges for the larger device.
- Branch circuit ratings: the overcurrent device sets the rating, and the permitted loads follow from it.
- Voltage drop: the 3 and 5 percent figures sit in informational notes, and items test whether you know it.
Fill and raceways
- Raceways overview: 51 bank questions across eight topics, sorted by what each item is asking for.
- Box fill: six categories under 314.16(B), each one counted its own way.
- Conduit fill: one comparison, decided by the four notes under Chapter 9 Table 1.
- Pull boxes and conduit bodies: three sizing methods, picked by conductor size and whether anything is spliced inside.
- Conduit bending math: multipliers, shrink and take-up, plus the 360 degree count the paper actually scores.
- Installations overview: 20 of the 56 scored knowledge items, and the template every Chapter 3 article follows.
- Wiring methods: every Chapter 3 article is cut from one template, so its section numbers mean the same thing.
- Cable types: every cable item turns on the location and on the building.
- Cable tray: Article 392 calls a tray a support system, and that word settles most items.
- Support and securing: secured and supported are separate duties with separate distances.
- Protection from damage: the rule moved to 300.6 in 2026, and the old number now holds different text.
- Burial cover: Table 300.7(A), with cover measured to the top of the raceway or cable.
- Expansion fittings: a quarter inch of calculated movement puts a fitting in a PVC run.
Load calculations
- Load calculations overview: the block behind the lowest journeyman pass rate, 20.56 percent on the calculations portion.
- Dwelling service calculation: floor area to amperes by the standard method, and the conditions on the optional one.
- Demand factors: which base figure each factor acts on, and where Article 120 moved them.
- Kitchen and laundry circuits: the circuits you install and the 1,500 VA each one hands the service calculation.
Motors and theory
- Motor circuits overview: motors carry 2 of the 24 scored journeyman calculations, and 6 of 30 on the master paper.
- Motor calculations: table current sizes the conductors and the short-circuit device, and nameplate current sizes the overload.
- Motor feeders: only the largest motor in the group gets the 125 percent.
- Motor overload protection: three devices on one motor circuit, each with a different job.
- Transformer calculations: the arithmetic is a ratio, and the marks go to tracking which winding each number belongs to.
- Theory overview: theory items are seldom hard, and the ones people miss hide a second step behind an easy first one.
- Power and volt-amperes: watts, volt-amperes and power factor, and which one the stem is asking for.
- Ohm’s law: 5 scored journeyman items carry a theory label, and the formula sits inside many more.
- Series and parallel: current is common in series and voltage is common in parallel, and the rest follows.
Grounding and bonding
- Grounding overview: 66 bank questions touch grounding, spread through services, equipment and special occupancies.
- Grounding or bonding?: two different jobs, and the one sentence in 250.4 that separates them.
- Grounding electrodes: every electrode present at the building gets bonded in, and a rod stands alone only when nothing else is there.
- Electrode conductor sizing: Table 250.66 and the three ceilings that cap it on rods and concrete-encased electrodes.
- EGC sizing: Table 250.122, sized from the overcurrent device ahead of the circuit.
- Bonding jumpers: main, system, supply-side and equipment jumpers, sorted by the job each one does.
- The neutral-to-ground bond: one bond at the service, with the two conductors kept apart everywhere downstream.
- Separately derived systems: a transformer secondary usually is one, and a generator depends on what the transfer switch opens.
Circuits and devices
- Required dwelling circuits: the four circuits 210.11(C) requires, and what three of them may never feed.
- Multiwire branch circuits: two circuits on one neutral, why they open together, and what an open neutral does to the loads.
- GFCI and AFCI locations: the 2026 ampere ceilings, plus the Texas exception that outlived the national sunset.
- Receptacle types: two letters on the receptacle face carry most of these items.
- Receptacle spacing: six feet measured along the floor line, and a fixed cabinet now breaks the wall space.
- Switches in the 2026 book: the wall switch moved to Article 406, and Article 404 still looks like the right place.
- Three-way wiring: the common, the travelers, and the white conductor that sometimes gets tape.
- Four-way wiring: two pairs of terminals and one job, swapping the travelers between two three-ways.
- Closet luminaires: two lookups for every closet item, the storage space and the clearance.
- Appliances and water heaters: the circuit comes off the nameplate, and the service calculation uses a figure of its own.
- HVAC circuits: the air conditioner GFCI exception that Texas kept after the national expiry.
Services and equipment
- Services: up to six disconnects, the 2026 outdoor disconnect rule, and clearances by what sits underneath.
- Feeders: the minimum size and overcurrent rules in Article 215, and where a feeder ends.
- Disconnecting means: what in sight from means, and the 50 foot distance behind it.
- Panelboards: one device protects the panel, and a back-fed breaker has its own rule.
- Enclosure types: the 110.28 type number describes the environment an enclosure can handle.
- Working space: depth, width, height and the space above, each a separate rule in 110.26.
- Wet, damp or dry: classify the location first, since a conduit on an outside wall is wet inside.
Special occupancies
- Pools and spas: the bonding grid removes voltage differences, and that idea answers most of Article 680.
- Health care facilities: two equipment grounding paths in a patient care space, the metal and an insulated copper conductor.
- Agricultural buildings: the equipotential plane, and why a small voltage matters to livestock.
- Marinas and boatyards: electric shock drowning, and which device carries the tighter trip setting.
- Temporary installations: the ordinary code with an end date, and the 90 days for holiday lighting.
- Hazardous locations: class, division and group, asked in that order.
- Solar PV: rapid shutdown, and the one idea that answers most PV items.
- Emergency and standby: Articles 700, 701 and 702, and the classification question behind each item.
- Elevators and escalators: the Article 620 disconnects and lighting, and the work the Texas licensing act leaves alone.
Question sets
54 of these topics also have a free set of 25 questions, every answer cited to its section. Open the question sets, or sit the timed practice exam to see where you stand.